This code needs to be in the tag:
top of page

Building a Deck This Summer? Skip the Concrete Wait

  • Writer: GoliathTech Utah
    GoliathTech Utah
  • Jun 12
  • 3 min read
newly installed deck - GoliathTech Utah

Summer is peak deck-building season in Utah — and that's exactly the problem. While the weather is perfect for outdoor projects, it's also the busiest time of year for concrete crews, excavation equipment, and city inspectors. If you're planning a new deck, that backlog can turn a simple weekend project into a months-long waiting game.


Why Summer Concrete Footings Create a Bottleneck


Traditional deck footings require excavation, forming, pouring concrete, and then waiting for it to cure — often 24 to 48 hours minimum before any framing can begin, and longer for full strength. In summer, every contractor in Weber County and beyond is trying to book the same excavators, the same concrete trucks, and the same inspectors. That demand — not the weather — is usually the real reason your project gets pushed back.


How Helical Piles Skip the Concrete Wait


POV from standing on a house deck

Helical piles are steel shafts with helix plates that are mechanically screwed into the ground to load-bearing depth. There's no excavation, no forms, and no curing time. A typical deck foundation can be installed and ready for framing in a single day — sometimes within a few hours, depending on the number of piers needed.

Because the installation doesn't depend on concrete trucks or curing schedules, your framing crew can often start the very next day — sometimes the same afternoon.


The Real Delay Risk Isn't Weather — It's Demand


Homeowners often assume rain or heat will be the thing that slows down a summer build. In practice, it's scheduling. Concrete-based contractors are booked weeks out during peak season because every project in the area needs the same resources at the same time. Helical pile installation crews aren't competing for that same bottleneck — which means your project can often be scheduled and completed sooner.


What Summer Installation Looks Like, Step by Step


1. Site assessment and layout — our team marks pier locations based on your deck plans and local soil conditions.

2. Pile installation — a hydraulic torque motor screws each helical pile to the engineered depth, monitoring torque to confirm load capacity.

3. Bracket attachment — post brackets are bolted to the top of each pile, ready for your framing crew.

4. Framing begins — because there's no cure time, your contractor can typically start building the same day or the next.


installed helical pile foundation before the deck is built

Built for Utah Soil, Backed by a Real Warranty


Helical piles are installed to depths and torque values engineered for your specific soil conditions, so they perform reliably whether your site has clay, expansive soils, or fill. Every installation is backed by a 30-year warranty on the piles themselves and a limited lifetime warranty on workmanship — giving you the same long-term confidence as a concrete foundation, without the wait.



Frequently Asked Questions


How long does helical pile installation take for a deck?

Most residential deck foundations are installed in a single day, with many smaller decks completed in just a few hours.


Can framing start the same day as pile installation?

Yes, in most cases. Since there's no concrete cure time, your framing crew can typically begin the same day or the next morning once brackets are attached.


Are helical piles suitable for summer installation in Utah?

Absolutely. Helical piles are installed year-round in Utah and work well in summer ground conditions, including dry, compacted, or clay-heavy soils.


How does the cost compare to a concrete foundation?

Costs are often comparable to or lower than traditional concrete footings when you factor in excavation, forming, concrete delivery, and the labor needed to coordinate multiple trades and schedules.


What warranty comes with helical pile foundations?

GoliathTech helical piles come with a 30-year warranty on the piles and a limited lifetime warranty on installation workmanship.


Building a Deck This Summer? Get Your Started Right Now with Helical Piles


Don't let a busy concrete schedule push your deck into next season. Get in touch with our team for a fast, no-obligation quote and find out how quickly we can get your foundation installed.


Comments


bottom of page